Team Armored Roofing
📞 727-251-9288🌐 Website

Roofing Projects in St. Petersburg, FL

18 completed projects by Team Armored Roofing

Solar attic fan photo 1Solar attic fan photo 2Solar attic fan photo 3
Solar attic fan
roofing · Jan 2026 · 39 photos
Solar attic fan installation in St. Petersburg, FL for improved ventilation and energy efficiency. Contact Team Armored Roofing for a free estimate today!
View Project Details →
8:30AM- Roof repair photo 18:30AM- Roof repair photo 28:30AM- Roof repair photo 3
8:30AM- Roof repair
repair · Jan 2026 · 5 photos
Professional roof repair services in St. Petersburg, FL. We address leaks and damage promptly. Contact Team Armored Roofing for a free estimate today!
View Project Details →
New plydek system photo 1New plydek system photo 2New plydek system photo 3
New plydek system
roofing · Nov 2025 · 41 photos
Professional plydek roofing system installation in St. Petersburg, FL. Upgrade your roof with durable, waterproof plydek. Contact Team Armored for a free quote!
View Project Details →
Dumpster rental and loading service photo 1Dumpster rental and loading service photo 2Dumpster rental and loading service photo 3
Dumpster rental and loading service
roofing · Nov 2025 · 11 photos
Scope of Work: DUMPSTER RENTAL: Bring equipment and dumpster as needed to load all trash and debris behind restaurant. Clean park parking lot use blower when completed for final cleanliness.
View Project Details →
Roof repair photo 1Roof repair photo 2Roof repair photo 3
Roof repair
repair · Nov 2025 · 23 photos
Scope of Work: ROOF REPAIR: Repair scared shingle and tore shingle. Ridge cap at shingle flat roof ridge cap tie in. Caulk flashing at chimney.
View Project Details →
9-12PM 6” Seamless Gutters and Downspouts & Chimney Repair photo 19-12PM 6” Seamless Gutters and Downspouts & Chimney Repair photo 29-12PM 6” Seamless Gutters and Downspouts & Chimney Repair photo 3
9-12PM 6” Seamless Gutters and Downspouts & Chimney Repair
repair · Oct 2025 · 11 photos
Scope of Work: install new 6" seamless gutters with new 5" down spouts where needed. 35LF + 1 downspouts (15LF) 15LF + 1 downspouts (15LF) 45LF of leaf guards at 10/LF. BRICK CHIMNEY REPAIR: Remove ridge cap to access the existing flashing on chimney and remove old flashing. Custom bend a lip on new flashing and grind a slot into chimney. Install new flashing around chimney inserting lip into slot with new 4300 sealer secure proper anchors. Reinstall ridge cap on metal roof.
View Project Details →
Shingle Roof Replacement photo 1Shingle Roof Replacement photo 2Shingle Roof Replacement photo 3
Shingle Roof Replacement
shingle · Oct 2025 · 42 photos
Scope of Work: SHINGLE ROOF REPLACEMENT: Remove shingles down to wood deck. Replace any rotten wood. Re-nail decking with 8D ring shank nails to meet code. Install new peel and stick underlayment throughout roof as a waterproof barrier for insurance discounts. Install new lead pipe boot covers, new galvalume vents, new drip edge, and new valley metal. Install new Timberline Lifetime GAF HDZ high wind rated shingles (154mph) or Owens Corning lifetime shingles (130MPH) Customers choice as each brand offers different colors. Install upgraded omni roll cobra ridge vents and add vents where needed to vent attic properly. Step seal all penetration's in the roof and walls such as pipes, vents, skylights, chimneys etc. for added protection. 19sq + 1 sq ridge cap. INCLUDED WITH SHINGLE ROOF REPLACEMENT: Upgraded Omni roll ridge vents. Peel and stick underlayment. Add additional vents if needed. Replace all boots and vents. Step seal all penetrations. Replace and add valley metal. Custom miter all drip edge. 5 Plywood included with replacement. 10 year labor and material warranty with Armored Roofing. Lifetime warranty on shingles with manufacturer. Clean all gutters. Clean yard and beds with magnets. Wind Mitigation Report for Ins Carrier All permit, dump fees & inspections included. Paint all boots & Vents to match roof.
View Project Details →
Roof over photo 1Roof over photo 2Roof over photo 3
Roof over
roofing · Sep 2025 · 48 photos
Scope of Work: SHINGLE ROOF OVER: Install certified cement around the entire perimeter of the roof. Install cement around all vents and pipes on the roof. Remove the old ridge vent. Install new GAF HDZ lifetime high wind rated shingles over existing 3 tab shingles. Install new upgraded cobra ridge vent at peaks for proper ventilation. 16sq 1sq cap
View Project Details →
Roof over photo 1Roof over photo 2Roof over photo 3
Roof over
roofing · Aug 2025 · 21 photos
Scope of Work: SHINGLE ROOF OVER: Install certified cement around the entire perimeter of the roof. Install cement around all vents and pipes on the roof. Remove the old ridge vent. Install new GAF HDZ lifetime high wind rated shingles over existing 3 tab shingles. Install new upgraded cobra ridge vent at peaks for proper ventilation. 11sq
View Project Details →
Roof over photo 1Roof over photo 2Roof over photo 3
Roof over
roofing · Aug 2025 · 21 photos
Scope of Work: SHINGLE ROOF OVER: Install certified cement around the entire perimeter of the roof. Install cement around all vents and pipes on the roof. Remove the old ridge vent. Install new GAF HDZ lifetime high wind rated shingles over existing 3 tab shingles. Install new upgraded cobra ridge vent at peaks for proper ventilation. 11sq
View Project Details →
Standing seam metal photo 1Standing seam metal photo 2Standing seam metal photo 3
Standing seam metal
metal · Aug 2025 · 45 photos
Scope of Work: Remove existing roof down to wood decking. Replace any bad or rotten wood. Re-nail decking with 8D ring shank nails to meet code. Install new high temp peel and stick underlayment for metal roof. Install new drip edge, valley metal, pipe covers, vents, zee trim, rake metal, and all components needed for system. Install new standing seam metal roofing system. This is a LOCK PANEL SYSTEM with 24 gauge, 16" wide panels. Striated design. and 1.5”seams. DARK BRONZE. 28sq 1sq cap NO RIDGE VENT IT’S spray INSULATION IN THE RAFTERS. INCLUDED WITH METAL ROOF REPLACEMENT: High temp peel and stick underlayment Polyglass. Add additional vents if needed. Replace all boots and vents. Step seal all penetrations. Replace and add valley metal. Custom miter all drip edge. All Plywood needed for rot included with replacement. 15 year labor and material warranty with Armored Roofing. 40 year paint and 25 year steel warranty with the manufacturer. Clean all gutters. Clean yard and beds with magnets.. FLAT ROOF REPLACEMENT TPO: Remove existing roof down to wood deck. Replace any rotten wood. Re-nail decking with 8D ring shank nails to meet code. Install new TPO flat roof. 3sq. After existing roof is removed we will level out the existing decking with a to ensure a proper install of the tapered system. Install tapered boards to create a pitch on the flat roof. Install using 3 inch plates and proper screws every 16 inches to meet code. Install new flat roof material and system chosen by customer over new tapered system. 3sq. Install solar attic fan. Cut hole and install fan then set solar peel and wires as needed.
View Project Details →
Roof Replacement TPO photo 1Roof Replacement TPO photo 2Roof Replacement TPO photo 3
Roof Replacement TPO
flat · Aug 2025 · 17 photos
Scope of Work: TPO ROOF REPLACEMENT: Remove existing roof down to wood decking. Replace any bad or rotten wood. Re-nail decking with 8D ring shank nails to meet code. Install new tapered boards or 1.5 to 2 inch foam board depending on what is needed. These are installed with 3 inch plates and proper length screws every 16 inches to meet code. Install new 60 mill GAF TPO rubber roofing system with metal plates and screws on all seams. Heat weld all seams to form roof into one solid unit. Install new TPO vents, rubber boot caps, flashing if needed and wrap all edges over new drip edge and install new turn bar around perimeter. Anchor turn bar with screws that have rubber washers every 6 inches. 5 Plywood included with replacement. Replace broken soffit screen. WOOD SOFFIT REPLACEMENT: Replace the damaged soffit in the lanai area. Replaced in sections and are billed at $250.00 for every 8 LF
View Project Details →
Roof Replacement TPO photo 1Roof Replacement TPO photo 2Roof Replacement TPO photo 3
Roof Replacement TPO
flat · Aug 2025 · 24 photos
Scope of Work: TPO ROOF REPLACEMENT: Remove existing roof down to wood decking. Replace any bad or rotten wood. Re-nail decking with 8D ring shank nails to meet code. Install new tapered boards or 1.5 to 2 inch foam board depending on what is needed. These are installed with 3 inch plates and proper length screws every 16 inches to meet code. Install new 60 mill GAF TPO rubber roofing system with metal plates and screws on all seams. Heat weld all seams to form roof into one solid unit. Install new TPO vents, rubber boot caps, flashing if needed and wrap all edges over new drip edge and install new turn bar around perimeter. Anchor turn bar with screws that have rubber washers every 6 inches. 5 Plywood included with replacement. Replace broken soffit screen. WOOD SOFFIT REPLACEMENT: Replace the damaged soffit in the lanai area. Replaced in sections and are billed at $250.00 for every 8 LF
View Project Details →
Roof maintenance service photo 1Roof maintenance service photo 2Roof maintenance service photo 3
Roof maintenance service
roofing · Jul 2025 · 8 photos
Scope of Work: ROOF maintenance SERVICE: seal all flashing tie ins on boots around A/C units, coping wall cap seams and tie ins at walls. seal around any vents or walls needing attention. seal any wall flashings. We use a heavy duty volcum type product designed to be outside in the Florida weather. This product comes with a 1 year warranty. This is to service the TPO roofs behind the balconies and the TPO roofs above the stairway on each unit.
View Project Details →
Roof replacement and other work requested photo 1Roof replacement and other work requested photo 2Roof replacement and other work requested photo 3
Roof replacement and other work requested
roofing · Apr 2025 · 42 photos
Scope of Work: TILE ROOF REPLACEMENT: Remove existing roof down to wood decking. Replace any bad or rotten wood. Re-nail decking with 8D ring shank nails to meet code. Install new polyglass peel and stick underlayment with cloth finish. Install10 - 8ft aluminum tile on ridge vents throughout roof to meet or pass hurricane zone requirements. Install white new aluminum drip edge, aluminum tile valley metal with 2” seam, aluminum ridge metal, brown aluminum bird stop brown vents and any other components needed for tile installation. Install new tile roof. design is westlake Barcelona 900 Florida blend. All tile is installed with tile bond which Armored Roofing is certified in on a 6/12 or less. Anything over 6/12 pitch would need screws in the tile resulting in an additional charge. 53sq tile 2sq ridge cap **We are also installing rake tile instead of mudding them in.. FLAT ROOF REPLACEMENT: Remove existing roof down to wood deck. Replace any rotten wood. Re-nail decking with 8D ring shank nails to meet code. Install black diamond peel and stick base sheet. (this is the only base sheet compatible to to modified torch per code) Install stripping around perimeter for added protection. Install new aluminum drip edge, vents and lead pipe covers where needed. Install new Flintastic GTA CertainTeed modified torch down roofing system. comes with a 10 year labor and material warranty with armored roofing. 11sq. After existing roof is removed we will level out the existing decking to ensure a proper install of the 1/4" tapered system. Install tapered boards to create a 1/4" start and built up tapered pitch on the flat roof. Install using 3 inch plates and proper screws every 16 inches to meet code. Install new flat roof material and system chosen by customer over new tapered system. 11sq. ROOF REPAIR- CHIMNEY BOX AND INSTALL: install new metal chimney box with brackets and brick or stone painted metal with custom flashing sleave and cap. (kit) Kit should come with stainless steel cap. Frame box with 2x4 to fit custom print aluminum chimney kit with printed aluminum panels and stainless steel cap with new flashing. aluminum screws used to attach panels. install strap on flume and brackets to frame for added support.. NEW 6" SEEMLESS GUTTERS (front of house_: install new 6" K style seamless gutters around front entry way and garage of house. gutters only. 69ft. ROOF REPAIR- REBUILD SOFFIT OVERHANG IN BACK OF HOUSE: Install new 2x6 rafters and extend over wall of house and build frame to taper and match the existing overhang on the other side. Install new 1x8 fascia with new 1x2 trim to match. Install sampson hurricane brackets with screws on each new rafter installed on both ends of tile area. using H1A 18 guage brackets. Add brackets to existing rafters on existing overhangs on 3 rakes that are blocked in from inside attic. INCLUDED WITH TILE ROOF REPLACEMENT: install 10 - 8ft aluminum tile on ridge vent throughout roof to meet hurricane zone 3 requirements. 5 plywood included. (additional plywood 1/2" 4x8 are billed at $95 each. tile polyglass TU PLUS peel and stick underlayment.step seal all penetrations for added protection. free wind mitigation report. all permit and dump fees. 10yr warranty for labor and material with Armored. limited lifetime warranty with manufacturer Install brown synthetic pipe covers Install all new bathroom and kitchen vents in aluminum brown color. If needed Team armored will install brown aluminum ohagin style vents on lower roof around flat area to match west lake tile.. ALUMINUM FASCIA ANDS VINYL SOFFIT OVERHANG: Install new vinyl soffit on south end of rebuilt overhang. install using aluminum white screws for added protection. includes new J channel where needed. cost for this is 350. Install new aluminum fascia across north and south end of rebuilt overhang for nice clean finish. Replace existing with new vinyl soffit on north end of overhang. Install new J channel where needed. cost for this 250. SKYLIGHT REPLACEMENT: Remove old skylight, wood box frame and roofing material around skylight. Install new wood work frame and aluminum self flashing skylight with flat glass finish and UV protectant built into glass made by VELUX. Install new sealer around perimeter under new skylight. Install new tile material back around new skylight including mudding in around the skylight as well for added protection. This is an impact rated skylight to meet 2bc/1rc/ fbc codes in zone 3 coastal areas.. NOTES: team armored will cover pool and decking. and AC. Team armored will cover pool equipment, walls, garage, and landscape around house. We will tarp driveway. We will run magnets to clean nails and clean all dirt and debris. No sub contractors used on this project
View Project Details →
Roof replacement and other work requested photo 1Roof replacement and other work requested photo 2Roof replacement and other work requested photo 3
Roof replacement and other work requested
roofing · Apr 2025 · 42 photos
Scope of Work: TILE ROOF REPLACEMENT: Remove existing roof down to wood decking. Replace any bad or rotten wood. Re-nail decking with 8D ring shank nails to meet code. Install new polyglass peel and stick underlayment with cloth finish. Install10 - 8ft aluminum tile on ridge vents throughout roof to meet or pass hurricane zone requirements. Install white new aluminum drip edge, aluminum tile valley metal with 2” seam, aluminum ridge metal, brown aluminum bird stop brown vents and any other components needed for tile installation. Install new tile roof. design is westlake Barcelona 900 Florida blend. All tile is installed with tile bond which Armored Roofing is certified in on a 6/12 or less. Anything over 6/12 pitch would need screws in the tile resulting in an additional charge. 53sq tile 2sq ridge cap **We are also installing rake tile instead of mudding them in.. FLAT ROOF REPLACEMENT: Remove existing roof down to wood deck. Replace any rotten wood. Re-nail decking with 8D ring shank nails to meet code. Install black diamond peel and stick base sheet. (this is the only base sheet compatible to to modified torch per code) Install stripping around perimeter for added protection. Install new aluminum drip edge, vents and lead pipe covers where needed. Install new Flintastic GTA CertainTeed modified torch down roofing system. comes with a 10 year labor and material warranty with armored roofing. 11sq. After existing roof is removed we will level out the existing decking to ensure a proper install of the 1/4" tapered system. Install tapered boards to create a 1/4" start and built up tapered pitch on the flat roof. Install using 3 inch plates and proper screws every 16 inches to meet code. Install new flat roof material and system chosen by customer over new tapered system. 11sq. ROOF REPAIR- CHIMNEY BOX AND INSTALL: install new metal chimney box with brackets and brick or stone painted metal with custom flashing sleave and cap. (kit) Kit should come with stainless steel cap. Frame box with 2x4 to fit custom print aluminum chimney kit with printed aluminum panels and stainless steel cap with new flashing. aluminum screws used to attach panels. install strap on flume and brackets to frame for added support.. NEW 6" SEEMLESS GUTTERS (front of house_: install new 6" K style seamless gutters around front entry way and garage of house. gutters only. 69ft. ROOF REPAIR- REBUILD SOFFIT OVERHANG IN BACK OF HOUSE: Install new 2x6 rafters and extend over wall of house and build frame to taper and match the existing overhang on the other side. Install new 1x8 fascia with new 1x2 trim to match. Install sampson hurricane brackets with screws on each new rafter installed on both ends of tile area. using H1A 18 guage brackets. Add brackets to existing rafters on existing overhangs on 3 rakes that are blocked in from inside attic. INCLUDED WITH TILE ROOF REPLACEMENT: install 10 - 8ft aluminum tile on ridge vent throughout roof to meet hurricane zone 3 requirements. 5 plywood included. (additional plywood 1/2" 4x8 are billed at $95 each. tile polyglass TU PLUS peel and stick underlayment.step seal all penetrations for added protection. free wind mitigation report. all permit and dump fees. 10yr warranty for labor and material with Armored. limited lifetime warranty with manufacturer Install brown synthetic pipe covers Install all new bathroom and kitchen vents in aluminum brown color. If needed Team armored will install brown aluminum ohagin style vents on lower roof around flat area to match west lake tile.. ALUMINUM FASCIA ANDS VINYL SOFFIT OVERHANG: Install new vinyl soffit on south end of rebuilt overhang. install using aluminum white screws for added protection. includes new J channel where needed. cost for this is 350. Install new aluminum fascia across north and south end of rebuilt overhang for nice clean finish. Replace existing with new vinyl soffit on north end of overhang. Install new J channel where needed. cost for this 250. SKYLIGHT REPLACEMENT: Remove old skylight, wood box frame and roofing material around skylight. Install new wood work frame and aluminum self flashing skylight with flat glass finish and UV protectant built into glass made by VELUX. Install new sealer around perimeter under new skylight. Install new tile material back around new skylight including mudding in around the skylight as well for added protection. This is an impact rated skylight to meet 2bc/1rc/ fbc codes in zone 3 coastal areas.. NOTES: team armored will cover pool and decking. and AC. Team armored will cover pool equipment, walls, garage, and landscape around house. We will tarp driveway. We will run magnets to clean nails and clean all dirt and debris. No sub contractors used on this project
View Project Details →
BRAVA SYNTHETIC TILE SYSTEM - Tile Crew 2 photo 1BRAVA SYNTHETIC TILE SYSTEM - Tile Crew 2 photo 2BRAVA SYNTHETIC TILE SYSTEM - Tile Crew 2 photo 3
BRAVA SYNTHETIC TILE SYSTEM - Tile Crew 2
tile · Mar 2025 · 40 photos
TEAR OFF AND DRY IN ONLY Scope of Work: BRAVA SYNTHETIC TILE SYSTEM: Remove existing roof down to wood decking. Replace any rotten wood per code. Re-nail all decking with 8D ring shank nails to meet current building code. Install tile peel and stick barrier throughout entire roof. Install new BEAVA SYNTHETIC system complete with new drip edge, valley metal, pipe vent covers, vents, and flashing components for tie in areas. Color and design of owners choice.. INCLUDED WITH TILE ROOF REPLACEMENT: install additional tile attic vents if needed. 5 plywood included. tile peel and stick underlayment. step seal all penetrations for added protection. free wind mitigation report. all permit and dump fees. 10yr warranty for labor and material with Armored. limited lifetime warranty with manufacturer . ALUMINUM SOFFIT AND FASCIA: This estimate includes fixing all missing soffit and repairing facia and gutters were needed. Also adding screws into new soffit and existing soffit for added strength around the house. Also includes all flashing and specialty items needed at flat roof, tires and custom metal caps and Dead Valley areas were needed as well. Matching the color to the new roof system.
View Project Details →
BRAVA SYNTHETIC TILE SYSTEM - Tile Crew 2 photo 1BRAVA SYNTHETIC TILE SYSTEM - Tile Crew 2 photo 2BRAVA SYNTHETIC TILE SYSTEM - Tile Crew 2 photo 3
BRAVA SYNTHETIC TILE SYSTEM - Tile Crew 2
tile · Mar 2025 · 40 photos
TEAR OFF AND DRY IN ONLY Scope of Work: BRAVA SYNTHETIC TILE SYSTEM: Remove existing roof down to wood decking. Replace any rotten wood per code. Re-nail all decking with 8D ring shank nails to meet current building code. Install tile peel and stick barrier throughout entire roof. Install new BEAVA SYNTHETIC system complete with new drip edge, valley metal, pipe vent covers, vents, and flashing components for tie in areas. Color and design of owners choice.. INCLUDED WITH TILE ROOF REPLACEMENT: install additional tile attic vents if needed. 5 plywood included. tile peel and stick underlayment. step seal all penetrations for added protection. free wind mitigation report. all permit and dump fees. 10yr warranty for labor and material with Armored. limited lifetime warranty with manufacturer . ALUMINUM SOFFIT AND FASCIA: This estimate includes fixing all missing soffit and repairing facia and gutters were needed. Also adding screws into new soffit and existing soffit for added strength around the house. Also includes all flashing and specialty items needed at flat roof, tires and custom metal caps and Dead Valley areas were needed as well. Matching the color to the new roof system.
View Project Details →