Change order
roofing · Oct 2025
Scope of Work: Plywood decking needed: Remove and replace 13 sheets 1/2” plywood due to storm and water damage. This is in addition to any woodwork needed on the original, tear off and dry it.. ROOF REPAIR-second layer and nailing: Cut out and remove foam between two by fours and nail decking with a D ring shank nails. Document work via photos showing permit number date and address. Will use a ton of photos during process. After replacing all of the plywood, we will then install a second fresh layer of Polyglass high temp pee, and stick underlayment. 31sq. 3% CC FEE
View Project Details →
Change order
roofing · Oct 2025
Scope of Work: Plywood decking needed: Remove and replace 13 sheets 1/2” plywood due to storm and water damage. This is in addition to any woodwork needed on the original, tear off and dry it.. ROOF REPAIR-second layer and nailing: Cut out and remove foam between two by fours and nail decking with a D ring shank nails. Document work via photos showing permit number date and address. Will use a ton of photos during process. After replacing all of the plywood, we will then install a second fresh layer of Polyglass high temp pee, and stick underlayment. 31sq. 3% CC FEE
View Project Details →
Repair photo 1Repair photo 2
Repair
repair · Jul 2025 · 2 photos
Scope of Work: Solar attic fan (2): Install solar attic fans: 1. Cut an appropriate hole for the installation of the fan. 2. Install the fan securely in place. 3. Set up the solar panel and connect the necessary wires as required. 4. Install new shingles to ensure they match the existing roof. 5. Carefully blow insulation away from the soffit vents to maintain proper ventilation.
View Project Details →
null photo 1null photo 2null photo 3
roofing · Jun 2025 · 10 photos
Scope of Work: ROOF INSPECTION: After inspecting the property, I have found that there is a couple issues going on here. The first main issue is, they used really thin, cheap plumbing in the attic to run the water. Because this plumbing is so thin it is soaking up the heat way faster than any normal PVC Plumbing wood. You combine that with a lot of the soffit vents being covered with blowing insulation. It’s not getting proper airflow to keep the attic cool. The lines are then also ran about 15 to 16 inches from the ridge, which is where all the heat accumulates. Some of the thin piping is buried in blowing insulation as well. When you add all these things together, it’s very possible that the water could be coming extremely hot. The attic could easily be getting up to 140 to 160. What I recommend is we blow out the soffit that areas with a blower from the bottom up. Then we install two solar attic fans to force the heat out of the attic to keep it at a manageable temperature.
View Project Details →
Standing seam metal roof and rebuild photo 1Standing seam metal roof and rebuild photo 2Standing seam metal roof and rebuild photo 3
Standing seam metal roof and rebuild
metal · May 2025 · 4 photos
Scope of Work: Remove existing roof down to wood decking. Replace any bad or rotten wood. Re-nail decking with 8D ring shank nails to meet code. Install new high temp peel and stick underlayment for metal roof. Install new drip edge, valley metal, pipe covers, vents and all components needed for system. Install new standing seam metal roofing system. This is a GULFCOAST GULFLOK STRIATED PANEL SYSTEM with 16" wide panels and 1" seams. Color is terra cotta . 31sq standing seam 1sq hip and ridge. SKYLIGHT REPLACEMENT: Remove old skylight and roofing material around skylight. Remove old curb if needed. Install new skylight with flat glass finish and UV protectant built into glass which is shatter resistant. Install new sealer around perimeter under new skylight. Install new roofing material back around new skylight. Flat in with new metal roof. SKYLIGHT FLASHING IN WITH ROOF: Remove old skylight and roofing material around skylight. Install new flashing kit around curb for new roof and reinstall skylight
View Project Details →
Standing seam metal roof and rebuild photo 1Standing seam metal roof and rebuild photo 2Standing seam metal roof and rebuild photo 3
Standing seam metal roof and rebuild
metal · May 2025 · 4 photos
Scope of Work: Remove existing roof down to wood decking. Replace any bad or rotten wood. Re-nail decking with 8D ring shank nails to meet code. Install new high temp peel and stick underlayment for metal roof. Install new drip edge, valley metal, pipe covers, vents and all components needed for system. Install new standing seam metal roofing system. This is a GULFCOAST GULFLOK STRIATED PANEL SYSTEM with 16" wide panels and 1" seams. Color is terra cotta . 31sq standing seam 1sq hip and ridge. SKYLIGHT REPLACEMENT: Remove old skylight and roofing material around skylight. Remove old curb if needed. Install new skylight with flat glass finish and UV protectant built into glass which is shatter resistant. Install new sealer around perimeter under new skylight. Install new roofing material back around new skylight. Flat in with new metal roof. SKYLIGHT FLASHING IN WITH ROOF: Remove old skylight and roofing material around skylight. Install new flashing kit around curb for new roof and reinstall skylight
View Project Details →
Roof repairs photo 1Roof repairs photo 2Roof repairs photo 3
Roof repairs
repair · Mar 2025 · 24 photos
Need roof repairs in Valrico? Team Armored Roofing provides expert service. Contacting the tenant was a key part of this successful repair. Get a free estimate today!